20160313_204323
24 March 2016

Progress in the kitchen

Things are moving on slowly but surely in the kitchen with the tall units and airing cupboard fitted, the work surfaces now correctly installed, sink in with waste plumbed (hot & cold just need connecting to the feeds) and the hob installed.

20160314_134416
The left hand joint with the correct number of clamps
20160313_204258
The lefthand joint
20160313_154811
Gareth & Mark checking measurements
20160313_204302
Right hand joint
20160313_204323
One joint done - time for the second one
20160314_171657
One of the resin filled joints prior to sanding
20160314_162924
Sanding the resin filled joints
20160307_183724
Tall units in place with cables reday for wiring
20160307_214634
Installing the oven & microwave in the tall cabinets
Cupboards assembled around extractor
Wall units and extractor in
20160317_103311
Hob fitted
20160316_094928
Work surfaces done ready for cutting the hob hole and plumbing
20160319_111819
Sink installed just waiting for the H&C water to be connected
20160310_161905
Tall units in with the doors on and the airing cupboard unit in place
20160310_161949
Another view of the tall units looking through to the hall
Lights, kitchen, mirror With a little help from your friend

Related Posts

20160609_191604

2015 Kitchen Extension

Busy busy busy – done (for a while at least)

20160511_201200

2015 Kitchen Extension

Hall & Kitchen nearly there

20160401_211606

2015 Kitchen Extension