Progress in the kitchen
Things are moving on slowly but surely in the kitchen with the tall units and airing cupboard fitted, the work surfaces now correctly installed, sink in with waste plumbed (hot & cold just need connecting to the feeds) and the hob installed.
- The left hand joint with the correct number of clamps
- The lefthand joint
- Gareth & Mark checking measurements
- Right hand joint
- One joint done - time for the second one
- One of the resin filled joints prior to sanding
- Sanding the resin filled joints
- Tall units in place with cables reday for wiring
- Installing the oven & microwave in the tall cabinets
- Wall units and extractor in
- Hob fitted
- Work surfaces done ready for cutting the hob hole and plumbing
- Sink installed just waiting for the H&C water to be connected
- Tall units in with the doors on and the airing cupboard unit in place
- Another view of the tall units looking through to the hall