Tiles, underfloor heating & flue

This week saw the tiles going onto the roof, insulation starting to be added on between the joists, the steel was partially clad with extra-fire resistant plasterboard and the underfloor heating pipes were installed along with the manifold and pump.

20151002_095044
Tiling round the Velux windows
20151002_154950
Gareth looking at the roof tiling
20151002_081433
The nearly finished tiled roof
20151002_151310
The boiler flu parts finally arrive and it is held in position
20151002_150837
The underfloor heating pipes clipped into the floor insulation
20151002_121502
Checking for leaks in the system
20151002_122844
The first of the bespoke cabinets arrives, this one is for the shower room basin
20151002_081248
And the insulation goes in between the joists and holes are cut for the down lighters
Cables, Wires, Gutters, Pipes & Roof More wires & a floor

Related Posts

20160609_191604

2015 Kitchen Extension

Busy busy busy – done (for a while at least)

20160511_201200

2015 Kitchen Extension

Hall & Kitchen nearly there

20160401_211606

2015 Kitchen Extension

With a little help from your friend

Back To Top
Chris & Gareth's website
© Chris & Gareth's website 2021
Powered by WordPress • Themify WordPress Themes