20150924_154512
24 September 2015

Cables, Wires, Gutters, Pipes & Roof

A lot going on this week with changes to the soil stack, guttering, plumbing and electrics.  Also by the end of the week the roofing felt was on giving a bit of rain protection and time for the slab to dry out before the insulation and screed is laid.

20150922_124653
The draw string for the aerial cables
20150922_124600
Looking down the chimney at the boiler flue and new cables
20150923_102809
Flue and cables at the kitchen end
20150923_102720
Replacing the guttering and amending the soil stack
20150924_154355
Roofing felt goes on
20150924_154512
Cables run in for down lights
20150925_162734
Trunk added for cables on the wall
20150925_162654
And behind the tall cabinets for the cooker & fridge etc
20150925_162618
Boxing in starts around the steels
20150924_154714
And we start using the real position for the door
One Team Finishes & Others Start Tiles, underfloor heating & flue

Related Posts

20160609_191604

2015 Kitchen Extension

Busy busy busy – done (for a while at least)

20160511_201200

2015 Kitchen Extension

Hall & Kitchen nearly there

20160401_211606

2015 Kitchen Extension

With a little help from your friend

Back To Top
Chris & Gareth's website
© Chris & Gareth's website 2021
Powered by WordPress • Themify WordPress Themes