Cables, Wires, Gutters, Pipes & Roof
A lot going on this week with changes to the soil stack, guttering, plumbing and electrics. Also by the end of the week the roofing felt was on giving a bit of rain protection and time for the slab to dry out before the insulation and screed is laid.
- The draw string for the aerial cables
- Looking down the chimney at the boiler flue and new cables
- Flue and cables at the kitchen end
- Replacing the guttering and amending the soil stack
- Roofing felt goes on
- Cables run in for down lights
- Trunk added for cables on the wall
- And behind the tall cabinets for the cooker & fridge etc
- Boxing in starts around the steels
- And we start using the real position for the door